- combined met mast (50 m) + SODAR bankable wind measurement campaign
- Galvanized hot dip met mast supply
- Measurement sensor supply (NRG/THIES): anemometers, temperature, wind vanes, humidity and pressure
- Met mast installation according IEC 61400-12-1:2017
- Data management
- Data analysis
- Report preparation
Met mast
Met mast + SODAR
Project in North Kazakhstan region, 97 m
Project in Akmola region, 100 m mast
Met mast
- Galvanized hot dip met mast supply
- Measurement sensor supply (NRG): anemometers, temperature, wind vanes, humidity and pressure, heated sensors
- Met mast installation according IEC 61400-12-1:2017
- Data management
- Data analysis
- Report preparation