CEER has signed agreement for Grid connection scheme for 50 MW project development and grid interconnection scheme. CEER is responsible for receiving technical conditions, wind measurement campaign and full design, including foundation design. Wind farm is planned to be constructed by Q3 2024. Wind farm capacity is 50 MW with expansion up to 300 MW. Location of plant:15 km from Ekibastuz town, Pavlodar region in Kazakhstan.